The scope for this Apogee project includes new controllers, interior cabinets, ceiling, wall panels, and flooring, LED lighting, and stainless-steel bumper guard rails along with and hoisting machines and ropes.
The elevator lobbies on Levels four, seven, eight, nine, and ten will be completely renovated with new flooring, wall, and ceiling finishes. The LED ceiling light will also be replaced. Only one elevator will be out of commission at a time.