It was also found that most of the existing fan coil units were obsolete, so newer, more efficient units were incorporated into the design. To further upgrade the mechanical systems, a heating hot water system was added to facilitate the future switch-over of a complete VAV system.
Building heating loads were calculated using the original envelope construction in order to estimate a worse-case demand for the new hot water system. Finally, modernized controls were added to the building’s existing air handlers.