The site was adjacent to a parking lot and partially surrounded by a security fence with an approximately 3,000-SF concrete pad to be used as parking and staging for maintenance activities.
Improvements at the tower location include a four-foot concrete strip around the base and concrete access drives from a parking lot to the tower. Security fencing with a sliding was added along with a new 12-inch water main approximately 1,400 feet in length.
Some sidewalk, curb and pavement replacement were needed along with 560 feet of 18-inch pipe drain line for the tank, which connects to an inlet.