Apogee conducted a field survey to verify the existing equipment, locations, and installations. Based on the survey, existing documents, and discussions with the VA representatives, the work includes but is not limited to:
- Replacement of underground complex medium voltage feeders
- Upgrading existing panelboards in Buildings 70 & 111
- Upgrading switchboards in Building 70