Project
VA Houston Upgrade Sterile Processing Service (SPS)
Apogee was tasked with providing full and complete design drawings for the renovation of the Sterile Processing Supply (SPS) Suite located in the basement level of the Michael E. DeBakey VA Medical Center.
Apogee was tasked with providing full and complete design drawings for the renovation of the Sterile Processing Supply (SPS) Suite located in the basement level of the Michael E. DeBakey VA Medical Center. This project aimed to expand the SPS area by utilizing the existing logistics and laundry spaces to significantly increase its capacity.
The project began with a thorough field investigation to survey the area, verify the existing building structure, and assess the adequacy of square footage for each function. Apogee evaluated utility systems and the integrity of the structure while verifying the accuracy of as-built drawings compared to the current conditions. In addition, the team conducted master and medical equipment planning, carefully reviewing existing designs and building criteria to coordinate the renovation’s systems and components. Space planning was critical for improving workflow, which was based on an established sequence of operations.
As part of the planning process, Apogee presented three optional layouts to VA leadership for comparison, ensuring that each adhered to life safety requirements, facilitated equipment installation, and avoided potential construction conflicts. MEP engineering played a pivotal role in ensuring that the design met all utility requirements, with systems such as electrical, mechanical, air ducts, and piping confined to the interstitial space, as mandated by the design criteria. On the architectural side, Apogee ensured that the interior design and finishes aligned with the facility’s existing standards, including a mix of vinyl sheet flooring, luxury vinyl tile, and resinous epoxy base flooring to meet the functional and aesthetic needs of the renovated SPS suite.
Client
U.S. Department of Veterans AffairsLocation
Houston, TXServices
Fire Protection, Architecture, Interior Design, MEP Engineering, TelecomSize
9,300 SFConstruction Cost
$7.4M