As prime design contractor, Apogee Consulting Group provided project management, mechanical, and electrical engineering design services for the replacement of air handling units at the Fayetteville, N.C. VA Medical Center.

This AHU replacement included an upgrade of all associated ductwork, piping, controls, and electrical connections to maintain a fully functioning system.

Additionally, an existing air-cooled chiller was replaced. Due to the locations of the units, strict infection control precautions were implemented.

Apogee provided construction documents, specifications, and a cost estimate to complete the work. Allowances were made within the cost estimate for ductwork cleaning, architectural ceiling and wall repairs as needed, startup, and commissioning.